Skip to content
Monday – Friday: 7:00 a.m. – 4:30 p.m.Veteran owned(406) 555-0105

How pricing works

How a stain job is priced

Your price is written after we walk the wood.

  • What happens at the visit

    We walk the deck, the fence runs or every side of a log home, check the old finish and the soft spots, and brush two or three samples on a hidden board.

  • When you get the number

    In writing, after the walk-through, with a line for each surface and a line for each repair.

  • Late-season and rush jobs

    They take a different schedule than early summer. The days, the drying day and the rain rule are written on the estimate.

  • If the job changes

    Boards, posts or logs that turn out to be soft once the old finish is off are priced in writing before we replace them.

What moves a price

Six things we write down at the walk-through

  • Size

    Square feet of deck, feet of fence or number of walls.

  • Height and access

    Anything past a ladder's reach needs a lift or scaffold.

  • The old finish

    A sound coat is washed. A failing or solid coat is stripped.

  • The wood's condition

    Soft boards, popped nails and loose rails are written as repairs.

  • Stain type and coats

    Transparent, semi-transparent or solid, and one coat or two.

  • When we can do it

    Late-season and rush jobs take a different schedule than early summer.

Compare two quotes

A written stain estimate and a vague one

Whoever you hire, the estimate should say these things.

A written stain estimate and a vague one
It saysA vague oneA written estimate
SurfacesA vague one"Stain the deck"A written estimateBetter: Each deck, fence run or wall, with its size
PrepA vague one"Prep included"A written estimateBetter: Wash, dry, sand and repair, each named
CoatsA vague oneNot statedA written estimateBetter: The number of coats and the finish type
ProductA vague one"Quality stain"A written estimateBetter: The product named, with its data sheet
RepairsA vague oneAdded to the bill laterA written estimateBetter: Priced in writing before we do them
ScheduleA vague one"Next week"A written estimateBetter: Days, the drying day and the rain rule
Payment and warrantyA vague oneCash at the endA written estimateBetter: A payment schedule and warranty terms

Price questions

What is on a written estimate?

The surfaces and their size, the repairs, the prep, the number of coats, the product and finish type, the color, the cleanup, the schedule, the payment schedule and the warranty terms. If a line is missing, ask for it.

What does the estimate not include?

Boards, posts or logs that turn out to be soft once the old finish is off, and any color beyond the ones written down. We price anything we find in writing before we do it.

How do the deposit and payment work?

A deposit books your slot. The rest is due on the payment schedule in your written estimate. We take check, card or bank transfer.

What does the warranty cover?

Our written warranty covers our workmanship. Terms, limits and exclusions are in your written warranty. Stain on exposed wood wears with sun and snow, and no warranty covers ordinary wear.